As an owner of a contracting company, a proposal offer has
to be made which gives the best most profitable price per bank cubic meter for a
pre-stripping mining operation.
First, the total
volume that has to be excavated is calculated. Then, a plan has to be designed in what order the mine is excavated. Dumping sites
and access roads influence the strategy in which the mine is going to be excavated.
After this is done, different scenarios using different machinery are designed. Using
these scenarios, different costs calculations can be made and a price per bank cubic meter
can be offered. With this price, a conclusion can be made on what the best scenario
for this project is and therefore the most profitable for the contracting company.